Procurement

Well-established record of accomplishment in the procurement of project materials and equipment using the best international sources of materials and equipment. Also expediting materials and inspection.
Procurement planning makes the most out of your resources
Good procurement planning is essential to optimize the work invested by the procurement function towards achieving the overall goals of your organization.
UNITED procurement planning solution makes it easy to start scheduling any sourcing process be it a product or a service. Responsible tasks, responsible people, costs and schedules are all in control.
UNITED Planning is a centralized tool for planning and managing your organization’s all procurements – it eases procurement risk management and offers more transparency for collaboration and predictability of procurement process.

logo-mark-1

The objectives of procurement are:

• Develop procurement procedures dedicated to the project.


• Comply with project Safety, Health and Environment policy.


• Develop purchasing schedule based on Project Master Schedule and highlighting critical equipment and material for early purchase activities.


• Compliance with applicable company and government requirement and Contractor’s inquiry documents and material specifications shall conform to these requirements.


• Tight coordination with engineering to ensure correct selection of Vendor.


• Procure brand new products from selected reliable and experienced Vendors.


• Minimize overall project risk throughout.


• Verify Vendor’s financial stability, shop capability, shop load capacity, etc.


• Expediting of technical data(s) and drawings and others clarifications of both technical and commercial nature. In particular procurement also performs the evaluation and manufacture progress to keep on time delivery.


• Coordinate the timing of Inspection between Vendor and QC inspectors group.


• Timely deliver and arrange the shipping for purchased equipment to the job-site and distribute to Construction.


• Maximize zero OSDN (overage, shortage, damage and non-conformance)


••• The materials/equipments will be categorized by commodities such of the following:
– Rotating Equipment
– Static Equipment
– Electrical Equipment/Material
– Control System Equipment/Material
– Process Equipment
– Piping Material
– Plant Services Equipment/Material
– Grating
– Lifting Gears
– Civil Material